Assembly & Test

Rotary indexing station handling parts through an assembly sequence

Stations, cells and transfer systems configured around the process sequence, part variants and acceptance criteria. Handling, assembly, monitoring, testing and traceability run in one system.

What it does

From part handling to recorded test results

Part handling

Feed, orient, position and transfer parts through the sequence.

Assembly processes

Pressing, insertion, fastening and joining, controlled within the agreed scope.

Process monitoring

Sequence, part presence and selected parameters checked as the assembly runs.

Automated testing

Leak, functional or dimensional tests with defined pass and fail criteria.

Variant management

Recipes, tooling changes and variant verification across the agreed range.

Identification & traceability

Part identity tied to process data and test results, where you need it.

Applications

Stations and cells we build

Assembly stations & cells

Feeding, positioning, pressing, insertion, fastening and joining, combined in one station or cell.

In-process verification

Presence, sequence and process checks that stop a faulty build before it moves on.

Test stations

Functional and dimensional tests with agreed limits, pass/fail evaluation and recorded results.

Deliverables

From process description to training

  • Agreed process description, interfaces and acceptance criteria

  • Mechanical, electrical and controls engineering for the agreed scope

  • The integrated station, cell or transfer system

  • Factory acceptance testing against the agreed criteria

  • Installation and site acceptance testing where included

  • Drawings, schematics, bill of materials, manuals, software deliverables and training

Next step

Send the process information you have.

A process video, part drawing, part variants, current output, target cycle time and quality criteria are enough for a first engineering view.