Project Execution & Support

Industrial robot arm prepared for factory acceptance testing

Scope, interfaces, your inputs, approval gates and acceptance criteria, fixed at the start. The same plan follows the system through handover and into support.

Project stages

Six stages from concept to support


Image

Study & concept

Process, product and objectives reviewed. Architecture, sequence, interfaces and principal risks defined.


Image

Detailed engineering

Mechanical, electrical, controls, tooling and documentation design, for your approval.


Image

Build & integration

Manufactured, assembled, wired, programmed and integrated.


Image

Validation

Functional testing and factory acceptance testing against the agreed criteria.


Image

Installation & commissioning

Installed, site interfaces verified, site acceptance completed, ramp-up supported.


Image

Support

The agreed service, retrofit, spare-parts and lifecycle scope.

Engagements

Typical engagements

New automation system

Concept to commissioning for a new station, cell, machine or line scope.

Integration or line expansion

Equipment added or connected inside a running plant, with interfaces and acceptance responsibility agreed in advance.

Retrofit & lifecycle support

An existing system modified, or spares and support defined under an agreed scope.

Project control

Responsibilities visible throughout the project

The quotation and project plan name:

  • Your inputs, and the dates they are needed

  • Scope boundaries and exclusions

  • Mechanical, electrical, software and utility interfaces

  • Who owns the third-party equipment

  • Acceptance criteria and test conditions

  • Installation, ramp-up and support scope

Every change is recorded against that technical and commercial baseline.

Validation & handover

Evidence for acceptance and maintenance

Depending on scope, the handover package can include:

  • Design and risk-review records

  • Approved mechanical and electrical drawings

  • Bill of materials and recommended spare-parts list

  • Factory acceptance test (FAT) results and open-point record

  • Site acceptance test (SAT) record and handover documentation

  • Operating and maintenance manuals

  • Agreed source code and software backups

  • Operator and maintenance training records

Next step

Start with the current process and required result.

Process video, documentation, application scope, interfaces, target date, acceptance criteria. We name the next technical step and what is missing.